Author Archives: Trương Hà
Groundbreaking ceremony for Package No. 1 (EPC) under the project “Repair, Renovation and Upgrading of the sulfur recovery system to produce acid” at Ninh Binh nitrogenous fertilizer plant
On the morning of March 6, 2026, at Ninh Binh Nitrogenous Fertilizer Plant (Ninh Binh...
Consortium selected to lead Vietnam’s largest LNG power project
(According to www.offshore-energy.biz) A consortium of South Korea’s SK Innovation, PetroVietnam Power Corporation (PV Power),...
Cooperation Status between PVN and CIP in the South Central Offshore Wind Power Project No.1
(According to Vietnam Energy Magazine) In February, at the headquarters of the Ministry of Industry...
EPC Contract Signing Ceremony for Component Project No.1 – Quang Trach 2 LNG Power Plant
According to Vietnam Energy Magazine (https://nangluongvietnam.vn/), on 9 February 2026 in Hanoi, Vietnam Electricity Corporation...
PTSC Quang Ngai JSC Accelerates Maintenance and Overhaul of the Hydrogen Manufacturing Unit at the Nghi Son Refinery and Petrochemical Complex
In November 2025, at the Nghi Son Refinery and Petrochemical Complex (NSRP), Thanh Hoa Province,...
EPC Contract Signing Ceremony: Package No. 01: Design, technology transfer for supply of materials and equipment and construction and installation belong to Repair, renovation and upgrading of the sulfur recovery system to produce acid
On the afternoon of October 1 in Ninh Binh province, the consortium of PTSC Quang...
