9566 Exhaust Stacks Systems (2 Units) Posted on 21/06/202510/04/2026 by Phan Tấn Thanh Scope of work: Procurement of raw material, fabrication, packing and FOB Delivery Volume of work: 1300 Tons Owner: Jurong Engineering Duration: 11/2023 – 08/2024 Location: Jurong, Singapore Busy working atmosphere at PTSC Dung Quat Mechanical Factory PTSC Quang Ngai: A Bold Transition from Oil & Gas to National Infrastructure at Long Thanh Airport