- Scope of work: Material supply, fabrication, load test, packing, delivery Lifting and Erection Frame for HRSG to DAP Massan Port, Korea (the goods apply CE Marking)
- Volume of work: 208 Tons
- Owner: ENBW Energie Baden-Württemberg
- Duration: 12/2023 – 05/2024
- Location: Heilbronn, Germany