Petrochemical Complex in South of Vietnam – Package A1 – Olefins Plant

  • Scope of work: Steel structure erection, Mechanical erection, Piping fabrication & erection, Painting works
  • Volume of work: 4,800 tons (Steel structure erection), 324,000 ID (fabrication & erection of piping), 2,700 tons (Mechanical Erection), 63,000m2 (Painting works)
  • Owner: Long Son Petrochemical Complex
  • Location: Vung Tau, Vietnam
  • Duration: 01/2020 – 12/2023