Material tank construction work for the Long Son Petrochemicals Complex Posted on 11/04/202611/04/2026 by Trương Hà Scope of work: Material tank construction work for the Long Son Petrochemicals Complex Owner: Long Son Petrochemicals Co.,LTD Duration: 2025-2027 Location: Vung Tau, Vietnam Project on Investment, Repair, and Upgrade of the Sulfur Recovery to Acid System Procurement and installation of Heat Exchanger E-1128A/B/C/D/E