MECHANICAL FABRICATION PROJECTS
A096 – Exhaust System
- Scope of work: Fabrication of the Exhaust System for installation in the Andres Power Plant Project
- Volume of work: 210 Tons
- Owner: GE Vernova
- Duration: 12/2024 - 06/2025
- Location: Dominican Republic
Baltec 9617, 1x GE13E2 Bypass Exhaust System
- Scope of work: Procurement of raw material, fabrication, packing 1x GE13E2 Bypass Exhaust System
- Volume of work: 452 Tons
- Owner: Engie
- Duration: 09/2024 - 02/2025
- Location: Australia
9566 Exhaust Stacks Systems (2 Units)
- Scope of work: Procurement of raw material, fabrication, packing and FOB Delivery
- Volume of work: 1300 Tons
- Owner: Jurong Engineering
- Duration: 11/2023 - 08/2024
- Location: Jurong, Singapore
9544 Bypass Exhaust Systems (5 Units)
- Scope of work: Procurement of raw material, fabrication, packing and FOB Delivery
- Volume of work: 800 Tons
- Owner: Siemens Energy
- Duration: 07/2023 - 06/2024
- Location: Ireland
9501 Filter Houses (2 Units) for Hunter Power Project
- Scope of work: Procurement of raw material, fabrication, packing
- Volume of work: 684 Tons
- Owner: Mitsubishi Heavy Industries
- Duration: 01/2022 - 03/2023
- Location: New South Wales, Australia
GE Altbach & Heibronn
- Scope of work: Material supply, fabrication, load test, packing, delivery Lifting and Erection Frame for HRSG to DAP Massan Port, Korea (the goods apply CE Marking)
- Volume of work: 208 Tons
- Owner: ENBW Energie Baden-Württemberg
- Duration: 12/2023 - 05/2024
- Location: Heilbronn, Germany
9191 SGT800 Bypass System, 3.05 Diverter Damper + Guillotine
- Scope of work: Procurement of raw material, fabrication, packing and FOB Delivery
- Volume of work: 200 Tons
- Owner: Jurong Engineering
- Duration: 07/2023 - 12/2023
- Location: Malaysia
9613 Diverter Damper + Guillotine + GT Guillotines (3 Units)
- Scope of work: Procurement of raw material, fabrication, packing
- Volume of work: 166 Tons
- Owner: Vogt Power
- Duration: 01/2024 - 07/2024
- Location: Honduras
Baltec 9632, 4x SGT 800GFT Bypass Exhaust System
- Scope of work: Procurement of raw material, fabrication, packing 4x SGT-800GFT Bypass Exhaust System
- Volume of work: 243 Tons
- Owner: Siemens Energy
- Duration: 02/2024 - 10/2024
- Location: Middle East