PROJECT INFORMATION:
- Name: JAWA-1 COMBINED CYCLE GAS TURBINE POWPER PLANT (1760MW)
- Scope of work: Supply of raw material, Manufacture, full trial assembly, surface treatment, packing
- Location: Karawang, West Java, Indonesia
- Owner: Jawa Satu Power
- Duration: 02/2019 – 11/2019