PROJECT INFORMATION:
- Name: CIREBON2 1,000MW COAL-FIRED POWER PLANT PROJECT
- Scope of work: Supply raw material and fabrication for the system of Limestone Unloading Conveyor, Limestone Unloading Hopper, Gypsum Conveyor and Limestone Silo
- Location: Cirebon, West Java, Indonesia
- Contractor: Dong Yang PnF (Korea)
- Client/Owner: Mitsubishi Hitachi Power System (MHPS)
- Volume of Work: 255 Tons
- Duration: 08/2018 – 11/2019