SMP-9 PACKAGE – NGHI SON REFINERY

SMP9-6

PROJECT INFORMATION:

  • Name: The provision of installation and erection of steel structure, equipment & AG/UG piping for Nghi Son Refinery & Petrochemical Complex (SMP-9 Package)
  • Scope of work: Construction
  • Quantity: 10.000 tons (Steel Structure), 456.000 ID (Steel Pipe), 200.000 ID (Composite Pipe), 5.000 tons (Equipment)
  • Location: Nghi SLocation: Nghi Son Refinery, Thanh Hoa
  • Owner: Nghi Son Refinery & Petrochemical Limited Liability Company
  • Duration: 10/2014 – 10/2016