EPC PROJECTS

Material tank construction work for the Long Son Petrochemicals Complex
  • Scope of work: Material tank construction work for the Long Son Petrochemicals Complex
  • Owner: Long Son Petrochemicals Co.,LTD
  • Duration: 2025-2027
  • Location: Vung Tau, Vietnam
View more
Project on Investment, Repair, and Upgrade of the Sulfur Recovery to Acid System
  • Scope of work: Package No. 1 Engineering, Procurement of Materials and Equipment, and Construction (EPC)
  • Owner: Ninh Binh Nitrogenous Fertilizer LTD. Company
  • Duration: 2025-2026
  • Location: Ninh Binh, Vietnam
View more
Construction of an additional crude oil storage tank for the existing Dung Quat Refinery
  • Scope of work: Engineering, procurement and construction (EPC) for 01 tank with capacity of 65.000m³
  • Owner: Binh Son Refining and Petrochemical Joint Stock Company (BSR).
  • Duration: 2025-2026
  • Location: Quang Ngai, Vietnam
View more
Component Project No. 3: Airport Essential Facilities – Long Thanh International Airport Construction Project Phase 1
  • Scope of work: Package 4.9. EPC of Aircraft Fuel Supply System
  • Owner: Airports Corporation of Vietnam - JSC (ACV)
  • Duration: 2024 - 2026
  • Location: Dong Nai Province, Vietnam
View more
DUNG QUAT BIO-ETHANOL PLANT PROJECT

PROJECT INFORMATION:

  • Name: The provision of engineering, procurement and construction for Dung Quat Bio-Ethanol Plant Project
  • Scope of work: EPC
  • Quantity: 6.000 tons (Steel Structure), 120.000 ID (Pipe)
  • Location: Dung Quat Economic Zone, Quang Ngai
  • Owner: PetroVietnam Central Bio-Fuel JSC
  • Duration: 10/2009 - 2013
View more
TNK-4 PACKAGE – NGHI SON REFINERY

PROJECT INFORMATION:

  • Name: The provision of engineering, procurement and construction (EPC) of Tank 4 Package -  Nghi Son Refinery & Petrochemical Complex (TNK-4 Package)
  • Scope of work: EPC
  • Quantity: 6.000 tons (Plate Work), 40 tanks for utilities
  • Location: Nghi Son Refinery, Thanh Hoa
  • Owner: Nghi Son Refinery & Petrochemical Limited Liability Company
  • Duration: 09/2014 - 05/2016
View more
TWO ADDITIONAL CRUDE OIL TANKS & SULFUR PUMPS PROJECT – DUNG QUAT REFINERY

PROJECT INFORMATION:

  • Name: The provision of engineering, procurement and construction for Two Additional Crude Oil Tanks & Sulfur Pumps - Dung Quat Refinery
  • Scope of work: EPC
  • Quantity: 6.500 tons (Steel Structure & Plate Work), 55.000 ID (Pipe)
  • Location: Dung Quat Refinery, Quang Ngai
  • Owner: Binh Son Refining & Petrochemical Company Limited
  • Duration: 10/2009 - 08/2011
View more
P7 WAREHOUSE PROJECT – DUNG QUAT REFINERY

PROJECT INFORMATION:

  • Name: The provision of engineering, procurement and construction for P7 additional material storage warehouse project
  • Scope of work: EPC
  • Quantity: 350 tons (Steel Structure)
  • Location: Dung Quat Refinery, Quang Ngai
  • Owner: Binh Son Refining & Petrochemical Company Limited
  • Duration: 04/2014 - 10/2014
View more
ADDITIONAL SUCTION PUMP LINES FOR EXPORTING PRODUCT A92, DIESEL – DUNG QUAT REFINERY

PROJECT INFORMATION:

  • Name: The provision of engineering, procurement and installation for Additional Suction Pump Lines For Exporting Product A92, Diesel Through Truck Loading Dung Quat Refinery
  • Scope of work: EPC
  • Location: Dung Quat Refinery, Quang Ngai
  • Owner: Binh Son Refining & Petrochemical Company Limited
  • Duration: 08/2012 - 01/2013
View more